A Penhallow company - serving Dallas, TX
An open living room and dining area after a whole-home remodel

Techo-Bloc Driveway & Pavers Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Dallas
A remodeled living room with built-in shelves around the fireplace
A whole-home remodel with the living, dining and kitchen areas opened up
A remodeled family room with new windows and a window seat
A remodeled primary suite with built-in wardrobes and a window seat
A remodeled staircase with wood treads and a slim metal railing
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A wide opening with a new beam where the kitchen wall was removed
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

Techo-Bloc Driveway & Pavers: The Dallas Owner’s Guide

We stock and install Techo-Bloc-compatible pavers and driveway materials throughout Dallas, with typical installed paver driveway work running $7,000 – $18,000 depending on square footage, base condition, and the specific Techo-Bloc line you’re matching. Most Dallas homeowners reach out because a section of their driveway has settled, cracked, or heaved after our clay soil’s freeze-thaw-and-shrink cycle, or because they need replacement units to match an existing Techo-Bloc pattern after a utility repair tore up a section. You need to know whether your part can be matched, what it’ll cost, and whether the fix holds up in North Texas weather.

Call (940) 204-5368

Which Techo-Bloc Models This Applies To

A home office with a built-in desk and shelves

Techo-Bloc builds its paver and driveway lines around specific series: Blu 60 mm and 80 mm slabs, Industria, Hexa, Victorien, Borealis, and the Raffinato series, among others. The critical matching detail is the unit’s thickness and face dimension, not just the color name. A Blu 60 mm paver has a different profile than a Blu 80 mm unit, and they are not interchangeable in the same plane, even if the color is identical. The second matching detail is the mold series, because Techo-Bloc changes molds over the years and units from a 2015 production run may sit 1/16″ different from a 2024 run of the “same” paver.

We identify the right part by reading the underside markings on a clean unit: Techo-Bloc stamps the series name and often the plant code. If that’s worn off, we measure thickness and face dimensions with calipers and match against the current catalog. Penhallow Remodeling Dallas is an independent service provider, not affiliated with Techo-Bloc, which matters in a good way: we’ll tell you honestly when a quality aftermarket unit from a Texas distributor will sit flush, and when only an OEM Techo-Bloc unit will preserve the pattern. For driveway sections, we most often source OEM because color batch differences across years are too visible in direct sunlight.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your Techo-Bloc Driveway & Pavers Is Failing

  • Settling or a low spot that holds water after rain. Dallas clay shrinks during dry summers and swells after wet winters. That movement compacts the paver base unevenly, and the pavers follow the soil down. A low spot is almost always a base failure, not a paver failure.
  • Cracked or chipped paver faces. Vehicle tires over an edge that’s lost base support will snap the unit. Techo-Bloc pavers are dense, but concrete under point load without full base contact cracks like anything else.
  • Spreading joints or pavers drifting outward. Missing edge restraint, usually along a driveway’s outer border, lets the whole field slowly walk. You’ll see the gap widen between the border course and the field before anything else moves.
  • Efflorescence or a whitish haze that won’t scrub off. This is mineral migration through the paver, common in Dallas because our water is hard and our soil is alkaline. It’s cosmetic but persistent unless sealed after cleaning.
  • Rocking or wobbly individual units. If one paver rocks underfoot, the sand bedding below it has washed out. Left alone, that unit will crack and the wobble spreads to its neighbors.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

An open living space after a whole-home remodel

For Dallas paver driveway installation, you’re looking at $7,000 – $18,000 for a full driveway in the typical 400 – 800 square foot range, with Techo-Bloc pavers themselves typically representing 35 – 45% of the project cost. Spot repairs for a settled section or utility cut repair run lower, usually $1,200 – $4,000 depending on how much base rebuild is needed. What drives the number up: driveway slope and drainage work, deeper excavation to reach stable clay, and matching older Techo-Bloc colors that require sourcing from multiple distributors. What drives it down: good existing base, simple rectangular layout, and current-production units we can pull from Dallas-area stock.

Every quote includes the pavers, base material, delivery, grading, install, joint sand, and cleanup. We put the written price in your hand before we touch the ground, and the number stays the number. No change order at the curb.

DIY or Call Us?

Replacing a single broken paver that’s loose and accessible is a reasonable Saturday project if you can source the exact unit and aren’t fussy about joint sand color. Rebuilding a settled section, however, is not a DIY job. You have to excavate the base, compact it in lifts, re-set the units, and re-establish edge restraint, and if you skip compaction or use the wrong aggregate, the same low spot returns in eighteen months. On a driveway, any heavy compaction equipment also means calling an 811 locator before you dig. If you’re not sure which bucket you fall into, call (940) 204-5368 and describe what you’re seeing. We’ll tell you straight whether it’s a one-hour fix or a half-day base rebuild.

FAQs

A finished basement family room with a media wall and wet bar

Getting started with Penhallow in Dallas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Dallas team

A local crew that works across Dallas and the towns around it, to the same written standard as every Penhallow location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Dallas? Licensed & insured · Written quotes before work starts response · free estimates
Call (940) 204-5368
Local Service Coverage

Request a Free Estimate in Dallas

Tell us what you need - Penhallow Remodeling Dallas responds fast. No obligation.

By submitting this form, you agree to our Privacy Policy and consent to being contacted by call, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch