A Penhallow company - serving Dallas, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Mr-Glass Bathroom Remodeling Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Dallas
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A built-in window seat in a bay window
A dining nook with a built-in banquette
A home office with a built-in desk and shelves
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

Mr-Glass Bathroom Remodeling: The Dallas Owner’s Guide

We stock and install Mr-Glass-compatible bathroom components across the Dallas area, and a full Mr-Glass bathroom remodel in this market typically runs $9,000 to $28,000 depending on bathroom size, glass configuration, and what’s behind the existing walls. Most owners discover a problem the same way: a door that suddenly drags against the floor tile, a glass panel that won’t stay sealed at the base, or a subtle wobble in the frame that wasn’t there last month. What starts as an annoyance usually traces back to a part Mr-Glass designed as a wear item, and the fix is often a single afternoon when the right component is on hand.

Call (940) 204-5368

Which Mr-Glass Models This Applies To

A powder room with botanical wallpaper and a stone sink

Mr-Glass bathroom products fall into three broad families we see regularly in Dallas homes: framed sliding tub doors, semi-frameless shower enclosures, and full frameless glass panels with discrete hardware. The part compatibility question matters more than the model year, because Mr-Glass has used consistent glass thicknesses (3/8″ and 1/2″ for frameless work) but several generations of hinges, rollers, and bottom sweeps. Check the lower corner of the glass for a small etched logo; if that’s worn off, measure the glass thickness and the roller wheel diameter. That gets us to the right series faster than a model name.

On the OEM-versus-aftermarket decision: genuine Mr-Glass hardware is worth paying for when the part is the hinge or clamp, because those are engineered to bear the panel’s weight. Bottom sweeps, vinyl gaskets, and roller assemblies, however, have solid aftermarket equivalents that match Mr-Glass specs at a lower price. We carry both, and we’ll tell you which one makes sense for your door rather than defaulting to the priciest option. It’s the same way we handle KraftMaid cabinet hardware, Cambria edge profiles, and Silestone sink cutouts: match the spec, respect the warranty, skip the markup you don’t need.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your Mr-Glass Bathroom Remodeling Is Failing

  • The door drags or catches at the bottom track. Almost always the roller assembly: nylon wheel bearings wear out, the wheel flattens on one side, and the door rides low. Left alone, the wheel chews into the track and the repair bill doubles.
  • Visible oxidation or pitting on the hinge metal. Dallas water is hard, and in humid bathrooms the original Mr-Glass hardware can develop microscopic pits that eventually compromise the hinge’s grip on the glass. This is the warning sign to replace before a panel sags.
  • The bottom sweep won’t seal, even after adjustment. The vinyl wipes get brittle after years of soap, heat, and cleaning products. A fresh sweep restores the seal and stops the slow drip that was staining the tile.
  • A frameless panel flexes when you open the door. That’s not the glass, it’s the wall mount loosening behind the escutcheon plate. The fix is simple when caught early; let it go and the anchor holes wallow out.
  • Grout or tile at the base of the glass stays damp long after the shower dries. Water’s finding a path under the threshold, which means the seal between the Mr-Glass track and the tile has failed. In Dallas bathrooms with slab foundations, this can hide rot for months before it shows.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

A wood double vanity with two mirrors after a bathroom remodel

A full Mr-Glass bathroom remodel in Dallas runs $9,000 to $28,000. On the low end, you’re looking at a smaller bathroom, a straightforward tub-to-shower conversion, and stock glass dimensions. The high end covers larger master baths, frameless glass panels cut to exact opening measurements, and tile work that requires waterproofing the substrate (the moisture-resistant layer behind your tile) before anything goes up. Parts alone for the Mr-Glass components, new hinges and sweeps and handles, typically land between $300 and $900 depending on the series.

What’s included in our price: tear-out and disposal, waterproofing, the glass, the hardware, the labor, and the written guarantee. You get a written price before any work starts, so the number on day one is the number on the invoice. The 365-Day Done Right Promise covers the whole job in writing: if something fails inside that year, we come back and fix it at no charge, including a free second visit for any repair that needs redoing.

DIY or Call Us?

Glass panels and frameless shower doors are heavy, and tempered glass under tension from a misaligned hinge can crack without warning. That’s not a scare tactic, it’s physics: a 1/2″ thick frameless panel can weigh over sixty pounds, and when a worn hinge lets it shift, the edge pressure concentrates in one spot. We’d rather no homeowner learn what that sounds like at 10 PM. What you can safely do is identify the part, measure your glass thickness, and take photos of the failed hardware. Then call us. We’ll match the part, bring it on the truck in the correct finish and size, and have the repair done before the caulk tube is even opened.

Give you a number before I pick up a tool, that’s the only way I know how to start. Call (940) 204-5368 and Trevor or the crew will get the details and quote the work, free estimate, no pressure.

FAQs

A low-threshold walk-in shower with a bench and grab bar

Getting started with Penhallow in Dallas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Dallas team

A local crew that works across Dallas and the towns around it, to the same written standard as every Penhallow location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Dallas? Licensed & insured · Written quotes before work starts response · free estimates
Call (940) 204-5368
Local Service Coverage

Request a Free Estimate in Dallas

Tell us what you need - Penhallow Remodeling Dallas responds fast. No obligation.

By submitting this form, you agree to our Privacy Policy and consent to being contacted by call, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch